Reference list

[ Energy ] [ Pulp & Paper/PMC ] [ Oil & Gas ] [ Other Process Industries ]


 Energy
Daimyo Industrial use of steam from waste incineration plant
The waste incineration plant located in Hurum has lost its steam consumer (Hurum paper mill). Other alternatives for industrial use of the steam produced in the boiler from the waste incineration process were analyzed.
Client: Daimyo AS
2009

Explosives production Production plant for explosives - phase II
A cost and plan study for production plant for 500 ton/y high-energy low sensitivity explosive was completed in the phase 1 study. The phase 2 study is a downscaling to 100 ton/y, with a plan for stepwise increase to 300 ton/y production capacity.
Client: Chemring Nobel AS, Sætre
2008/09

Explosives production Production plant for explosives
Production plant for 500 tonnes/yr high-energy low sensitivity explosive. Cost and plan study with satisfactory uncertainty for investment decision.
Client: Chemring Nobel AS, Sætre
2008

Hydro Aluminium Energy analysis of aluminum coil kiln
Hydro Aluminium have several kins usedfor heat treatment of aluminium coils. This project was an analysis of the energy savings potential for one of these kilns.
Client: Hydro Aluminium Rolled Products AS, Holmestrand
2008

ZENG ZENG technology qualification
Technology qualification of the ZENG concept performed in cooperation with Det Norske Veritas, ZENG and Siemens Industrial Turbomachinery AB
Client: ZENG AS
2008

CO2/H2O CO2/H2O Properties
Research project focusing on the thermodynamic and physical properties of CO2/H2O mixtures. Financed partly by the Research Council of Norway
Client: Nebb Technology
2006/08

Bio-Energy Plant
BioEl Fredrikstad
Engineering of Bio Energy Plant
Fluidized bed incinerator wiht production of electricity, process steam and district heating (22 MW total). Engineering and coordination of Electro & Instrument. Technical responsibility for selection of steam turbine package supplier. Engineering of steam and energy distribution system.
Client: BGInnovation AS
2006/07

CESAm CCS Concept Study
Develop a process for increased total efficiency and increased CO2 capture for Thermal Power Plants with retrofit post-combustion CO2 capture installations.
Client: The Research Council of Norway
2006/07

ZENG Oxyfuel CCS Concept Study Phase II
Further development of the Concept Study Phase I for Natural Gas Power Plant with 100% CO2 sequestration. The study shall demonstrate a satisfactory cost effective solution. The object of the project is to build a demonstration plant within 2011.

The concept study is financed by Lyse Energi, Gassnova, Statoil and Shell Technology Norway.
Client: ZENG AS
2006/07

Patent Application Patent Application
The Company has made a patent application for a process that will increase the total efficiency and increase the CO2 capture in Thermal Power Plants with retrofit post-combustion CO2 capture installations. The process is a combination of CO2 capture with amine absorption and a variant of the ZENG process.
Client: Nebb Engineering / CO2 Norway
2006

Steam turbine Steam turbine cycle simulation
Concept study for evaluation of profitability in new boiler/steam turbine installation.
Client: Østfold Energi AS
2006

Steam turbine Steam turbine for waste incineration plant
Concept study for increased power production through new steam turbine and installation of new boiler.
Client: COWI AS (for Bergen Interkommunale Renholdsverk)
2006

Tine Meierier Contract and price models for steam delivery
Verification of district heating system including steam delivery to nine industrial sites in Brummundal, Norway
Client: Tine Meierier Øst in cooperation with Hoff Ind.
2005

Tjeldbergodden Natural gas power plant verification Study
Technical verification and cost efficiency study of the Tjeldbergodden natural gas fired Combined Cycle Power Plant (CCPP) (830 MW). The objective was to give a recommendation to Haltenkraft about whether or not to become an equity partner of the Power Plant. The report also included an evaluation of the preparation for a retrofit amine absorption unit.
Client: Haltenkraft DA
2005

Wood chips drying Conversion of dryer from sludge to wood chips
Investigation of Andritz "Triple pass drum dryer" used for drying sludge. Evaluation and recommendations for modifications required for converting it to wood chips drying
Client: Solør Tre
2005

ZENG Oxyfuel CCS Concept Study Phase I
Process design of Natural Gas Power Plant with 100% CO2 sequestration. The process development was made in co-operation with CES Inc. California.
Client: Lyse Energi / CO2 Norway
2004/05

Bio-Energy Plant
BioEl Fredrikstad
Feasibility Study for bio energy plant
Preparation and pre-engineering of electro and automation system for bio-energy plant. Development and simulation of steam generation system for bio-energy plant.
Client: BGInnovation AS
2004

Moelven Timber Concept Design
Concept design and simulation of the process for energy production based on wet wood chips and a new gas generator process.
Client: Moelven Timber AS
2004

Wind Turbine System Wind Turbine System
Control of the electrotechnical system and evaluation of the concept solution.
Client: Fred Olsen & Co
2001

[ Energy ] [ Pulp & Paper/PMC ] [ Oil & Gas ] [ Other Process Industries ]


 Pulp & Paper/PMC
Voith, Düren, Germany Emergency brake system
Delivery of emergency roll brake systems for two Finishing Machines.
Client: Voith Paper Fabrics, Düren, Germany
2009

BCTMP factory Relocation and modification of BCTMP plant
The plant is a 165 000 air dry tonnes per year mill for production of bleached CTMP from chips of Eucalyptus. The project work is basically a comprehensive revision of the technical part of an EPC contract between Pulp United (Pty) Ltd. (South Africa) and Rottneros AB for delivery of a complete bleached CTMP pulp mill for erection at Richards Bay in South Africa.
Client: Pulp United (Pty) Ltd., South Africa
2008/09

Voith, Ipoh, Malaysia Relocation and upgrading of Finishing Machine
Relocation and Modernization of Finishing Machine. Mechanical and electrical delivery and installation, PLC/PC based Control System with Drives for a complete Finishing Machine for Paper Machine Clothing.
Client: Voith Paper Fabrics, Ipoh, Malaysia
2008/09

Albany International, Halmstad, Sweden Relocation and Modernization of a Finishing Machine.
Electrical installation and commissioning of complete control system for Finishing Machine
Client: Albany International, Halmstad, Sweden
2008

Voith, Högsjö, Sweden Modernization of Finishing Machine.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Scope of supply::
- Mechanical and electrical supervision
- Control system NebbOpenStep-QA, based on:
- PLC system Siemens S7
- HMI system based on Citect
- Servo Drives type Lenze
- Fieldbus based on Profibus DP
- Advanced Maintenance and Recipe system
Client: Voith Paper Fabrics, Högsjö, Sweden
2008

Voith, Kunshan, China Relocation and upgrading of Finishing Machine
Relocation and modernization of Finishing Machine. Mechanical and electrical delivery and installation, PLC/PC based Control System with Drives for a complete Finishing Machine for Paper Machine Clothing.
Client: Voith Paper Fabrics, Kunshan, China
2008

Shri Dinesh Mills Ltd Finishing Machine
Modernization of Finishing Machine.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Scope of supply::
- Mechanical and electrical supervision
- Control system NebbOpenStep-QA, based on:
- PLC system Siemens S7
- HMI system based on Citect
- Servo Drives type Lenze
- Fieldbus based on Profibus DP
- Advanced Maintenance and Recipe system.
Client: Shri Dinesh Mills Ltd
2007

Voith, Högsjö, Sweden Installation of new equipment, upgrade of PLC and HMI system for Finishing Machine.
Delivered systems:
- Control system NebbOpenStep-QA, based on Citect.
- Advanced maintenance and recipe systems
Client: Voith Paper Fabrics, Högsjö, Sweden
2007

Heimbach Germany Emergency brake system - Finishing Machine
Developed and delivered emergency roll brake systems for two Finishing Machines.
Client: Heimbach Germany
2006

NebbPerm Installation and Commissioning
Installation and commissioning of several Permeability Gauges "NebbPerm" on PMC Plants in Europe.
Client: Undisclosed
2006

Voith Pater Fabrics, Høgsjø T2 Finishing Machine
Installation of new equipment, upgrade of PLC and HMI system for Finishing Machine.

Delivered systems:
- Control system NebbOpenStep-QA, based on Citect.
- Advanced maintenance and recipe systems.
Client: Voith Pater Fabrics, Høgsjø
2006

Voith Porrits & Spencer India Finishing Machine
Relocation and Modernization of a Finishing Machine.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- Mechanical and electrical supervision
- Control system NebbOpenStep-QA, based on:
- PLC system Siemens S7
- HMI system based on Citect
- DC converters type Lenze
- Fieldbus based on Profibus DP
- Advanced Maintenance and Recipe system.
Client: Voith Porrits & Spencer, India
2006

BCTMP Factory Feasibility study for new BCTMP factory
Feasibility study and project leadership for a greenfield Bleached Chemi-Thermo-Mechanical Pulp (BCTMP) factory. Planned production approx. 300 000 tons/year.
Client: NCT, Pietermaritzburg, South Africa
2005/07

Albany Finland (Järvenpää) Finishing Machine
Rebuilding and modernization of a Kvaerner finishing machine.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- Control system NebbOpenStep-QA, based on:
- PLC system Siemens S7
- HMI system based on Citect
- DC converters type Lenze
- Fieldbus based on Profibus DP
- Advanced maintenance and recipe systems.
Client: Albany Finland
2005/06

Huyck Australia Finishing Machine
Rebuilding and modernization of a Kvaerner finishing machine.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- Control system NebbOpenStep-QA, based on:
- PLC system Siemens S7
- HMI system based on Citect
- DC converters type Lenze
- Fieldbus based on Profibus DP
- Advanced maintenance and recipe systems.
Client: Huyck Ausralia
2005

Voith Fabrics Spain Finishing Machine
Rebuilding and modernization of a Kvaerner finishing machine.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- Control system NebbOpenStep-QA, based on:
- PLC system Siemens S7
- HMI system based on Citect
- DC converters type Lenze
- Fieldbus based on Profibus DP
- Advanced maintenance and recipe systems.
Client: Voith Fabrics Spain
2005

Voith Paper Fabrics, Høgsjø T6 Finishing Machine
Installation of new equipment, upgrade of PLC and HMI system for Finishing Machine.

Delivered systems:
- Control system NebbOpenStep-QA, based on Citect.
- Advanced maintenance and recipe systems.
- Drives
Client: Voith Paper Fabrics, Høgsjø
2005

NebbPerm Development Project
Development of a new Permability Gauge ("NebbPerm") for the PMC Industry. Read more here.
Client: Internal
2004/06

Bark treatment
Södra Cell Tofte
Bark treatment
Engineering and documentation of the electrical work. Installation supervision, and commissioning.
Client: Södra Cell Tofte
2004

BAT rapport
Norske Skog Follum
BAT report
Preparation of BAT report for NSI Follum Paper Mill to meet the authorities requirement. (Based on EU-directive, IPPC)
Client: Jaakko Pöyry Norge AS
2004

Green liquor
Södra Cell Tofte
Sludge dewatering of green liquor
Engineering and documentation of the electrical work.
Client: Södra Cell Tofte
2004

Mass- and Energybalance
Norske Skog Follum
Process study
Mass- and energy balance (fibre, whitewater, SS, KOF) for NSI Follum Paper Mill.
Client: Jaakko Pöyry OY
2004

Tamfelt Finland Finishing Machine
Rebuilding and modernization of a Jäger finishing machine.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- Control system NebbOpenStep-QA, based on:
- PLC system Siemens S7
- HMI system based on Citect
- DC converters type Lenze
- Fieldbus based on Profibus DP
- Advanced maintenance and recipe systems.
Dataexchange with SAP
Client: Tamfelt Finland
2004

Voith Fabrics Blackburn England Finishing Machine
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- Control system NebbOpenStep-QA, based on:
- PLC system Siemens S7
- HMI system based on Citect
- DC converters type Lenze
- Fieldbus based on Profibus DP
- Advanced maintenance and recipe systems.
Client: Voith Fabrics Blackburn England
2004

Voith Fabrics China Engineering and supervision
Engineering, planning, mechanical installation, test and commissioning during relocation of a Finishing Machine from USA to China.
Client: Voith Fabrics Kunshan
2004

Voith Fabrics China Finishing Machine
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- Control system NebbOpenStep-QA, based on:
- PLC system Siemens S7
- HMI system based on Citect
- DC converters type Lenze
- Fieldbus based on Profibus DP
- Advanced maintenance and recipe systems.
Client: Voith Fabrics Kunshan
2004

Wood chipps
Södra Cell Tofte
Wood chipps
Engineering and documentation of the electrical work. New chipper, high voltage AC motor, utility equipment. Installation supervision, and commissioning.
Client: Södra Cell Tofte
2004

Bark separation
Södra Cell Tofte
Bark separation
Engineering and documentation of electro and instrument for bark separation.
Client: Södra Cell Tofte
2003

BAT report
Huhtamaki Norway AS
BAT report
Preparation of BAT report and Mass- and energy balance (fibre, whitewater, SS, KOF) for Huhtamaki Norway AS.
Client: Jaakko Pöyry Norge AS
2003

O2 mixing Södra Cell Tofte Two step O2 mixing
New process in the O2 bleach plant. Documentation in Idok. Engineering, installation supervision, and commissioning.
Client: Södra Cell Tofte
2003

Service PM Nordic Paper Service on the paper machine
Review and service on the paper machine.
Client: Nordic Paper AS
2003

Voith Fabrics Ipoh Malaysia Edge-trimming device
Implementation of an automatic edge-cutting unit for cutting of fabrics. The cutter system is developed by Nebb Engineering and is also prepared for splitting of fabrics.
Client: Voith Fabrics Ipoh Malaysia
2003

Boil water Södra Cell Tofte Boiler water and condensate
Specification of instruments for upgrading and monitoring of boil water and condensate system.
Client: Södra Cell Tofte
2002

TM2 Södra Cell Tofte Rebuilding of TM2
Engineering, Installation, commissioning and documentation (Idok).
Client: Södra Cell Tofte / Jaakko Pöyry Norge
2002

Voith Fabrics Ipoh, Malaysia Automatic edgecutters including guidesystem
Engineering electro and mechanical installation, supervision, test and commissioning.
Client: Voith Fabrics Ipoh, Malaysia
2002

Voith Fabrics Ipoh, Malaysia Project management, engineering and commissioning.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- The control system NebbOpenStep-QA, based on:
- The PLC system NebbControl (Siemens S7)
- The HMI system NebbScada based on Citect
- Operating station NebbOS
- The information and communication system NebbCom
- The maintenance system NebbMaintenance
- The recipe system NebbProcessPilot
- DC and frequency converteres type Lenze
- Feltbus based on Profibus DP
Client: Voith Fabrics Ipoh, Malaysia
2002

PM 6 Peterson Linerboard Ranheim Optimizing the regulation system for PM 6.
Eveluation of the electrical system, including motordrives and regulation system for PM 6.
Client: Peterson Linerboard
2001

Cristini Italy Project management, engineering and commissioning.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- The control system NebbOpenStep-QA, based on:
- The PLC system NebbControl (Siemens S7)
- The HMI system NebbScada based on Citect
- Operating station NebbOS
- The information and communication system NebbCom
- The maintenance system NebbMaintenance
- The recipe system NebbProcessPilot
- AC motors and frequency converteres type Lenze
- Feltbus based on Profibus DP
Client: Kværner Eureka
2000/01

Huyck Austria Project management, engineering and commissioning.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- The control system NebbOpenStep-QA, based on:
- The PLC system NebbControl (Siemens S7)
- The HMI system NebbScada based on Citect
- Operating station NebbOS
- The information and communication system NebbCom
- The maintenance system NebbMaintenance
- The recipe system NebbProcessPilot
- AC motors and frequency converteres type Lenze
- Feltbus based on Profibus DP
Client: Kværner Eureka
2000

Tamfelt Finland Project management, engineering and commissioning.
Delivery of NebbOpenStep-QA ; PLC/PC based control system with drives for a complete Finishing Machine for Paper Machine Clothing.

Delivered systems:
- The control system NebbOpenStep-QA, based on:
- The PLC system NebbControl (Siemens S7)
- The HMI system NebbScada based on Citect
- Operating station NebbOS
- The information and communication system NebbCom
- The maintenance system NebbMaintenance
- The recipe system NebbProcessPilot
- AC motors and frequency converteres type Lenze
- Feltbus based on Profibus DP
Client: Kværner Eureka
2000

Munzinger Kalander 47 Switzerland Project management, engineering and commissioning.
Engineering of electrical and control system with drives for a complete Finishing Machine for Papermachine Clothing.
- Information and Communication System
- Servodrives
- PLC
- PC based HMI system
- Maintenance System
- Recipe System
Client: Kværner Eureka
1999

Munzinger Kalander 48 Switzerland Replacement of the HMI system.
Programming og commissioning of a new HMI system for a complete Finishing Machine for Paper Machine Clothing.
- Information and Communication System
- PC based HMI system
- Maintenance System
- Recipe System
Client: Kværner Eureka
1999

PM6 Norske Skog Saugbrug Control System.
Programming and testing of the expansion of the control system for PM6.
Client: Kongsberg Simrad
1999

SND Development project DEVELOPMENT PROJECT Automation/data.
Development of a maintenance system, a recipe system, a PC based HMI system, and total automation of Paper Machine Clothing (PMC) Machinery. Also development of communication over Internet/modem for maintenance and service.
Client: Nebb
1999

Voith Fabrics Blackburn England Replacement of the HMI system.
Programming and commissioning of a new HMI system for a Finishing Machine.
- Information and Communication System
- PC based HMI system
- Maintenance System
- Recipe System
Client: Kværner Eureka
1999

Voith Fabrics Waycross GA USA Replacement of the HMI system.
Programming og commissioning of a new HMI system for a complete Finishing Machine for Paper Machine Clothing.
- Information and Communication System
- PC based HMI system
- Recipe System
Client: Kværner Eureka
1999

Heimbach UK Manchester England Project management, engineering and commissioning.
Engineering of electrical and control system with drives for a complete Finishing Machine for Paper Machine Clothing, including tension control in crossmachine direction.
- Information and Communication System
- Servodrives
- PLC
- PC based HMI system
- Maintenance System
- Recipe System
Client: Kværner Eureka
1998

Ichikawa 7m Machine Japan Project management, engineering and commissioning.
Engineering of electrical and control system with drives for a complete Finishing Machine for Paper Machine Clothing, including tension control in crossmachine direction.
- Information and Communication System
- Servodrives
- PLC
- PC based HMI system
Client: Kværner Eureka
1998

Norske Skog Saugbrug AIM 1000
Programming and testing of expansion of AIM 1000.
Client: Kongsberg Simrad
1998

Sande Paper Mill Winder Upgrade of "Jagenberg Winder"
Rebuilding of "Jagenberg Winder" from pneumatic control devices to electrical control system based on Modicon Quantum PLC.
Client: Sande Paper Mill
1998

Swiss Wire Ireland Project management, engineering and commissioning.
Engineering of electrical and control system with drives for a complete Finishing Machine for Paper Machine Clothing, including tension control in crossmachine direction.
- Information and Communication System
- Servodrives
- PLC
- PC based HMI system
- Maintenance System
- Recipe System
Client: Kværner Eureka
1998

Albany 13m machine Australia Project management, engineering and commissioning.
Engineering of upgrading electrical and control system with drives for a Finishing Machine for Paper Machine Clothing.
- Information and Communication System
- DC drives
- PLC
- PC based HMI system
Client: Kværner Eureka
1997

Huyck Italy UPS System
Engineering and commissioning of UPS system for Finishing Machine.
Client: Kværner Eureka
1997

Ichikawa Japan Project management, engineering and commissioning.
Engineering of electrical and control system with drives for a complete Finishing Machine for Paper Machine Clothing, including tension control in crossmachine direction.
- Information and Communication System
- Servodrives
- PLC
- PC based HMI system
Client: Kværner Eureka
1997

Nippon Felt Japan Project management, engineering and commissioning.
Engineering of electrical and control system with drives for new press system for Finishing Machine.
- Information and Communication System
- PLC
- HMI system
Client: Kværner Eureka
1997

Paper Machine Sande Paper Mill Speed control of paper machine.
Changed the control scheme and optimized the speed control of the paper machine.
Client: Sande Paper Mill
1997

Voith Fabrics Canada Project management, engineering and commissioning.
Engineering of electrical and control system with drives for a Finishing Machine for Paper Machine Clothing.
- Information and Communication System
- DC drives
- PLC
- PC based HMI system.
Client: Kværner Eureka
1997

Voith Fabrics Högsjö Machine T2 Sweden Project management, engineering and commissioning.
Engineering of upgrading a electrical and control system with drives for a Finishing Machine for Paper Machine Clothing.
- Information and Communication System
- Servodrives
- PLC
- PC based HMI system
Client: Kværner Eureka
1997

Voith Fabrics Högsjö Machine T3 Sweden Project management, engineering and commissioning.
Engineering of upgrading electrical and control system with drives for a Finishing Machine for Paper Machine Clothing.
- Information and Communication System
- Servodrives
- PLC
- PC based HMI system
Client: Kværner Eureka
1997

Voith Fabrics Högsjö Machine T6 Sweden Project management, engineering and commissioning.
Engineering of upgrading electrical and control system with drives for a Finishing Machine for Paper Machine Clothing.
- Information and Communication System
- Servodrives
- PLC
- PC based HMI system
Client: Kværner Eureka
1997

Weavexx USA Training of technical personnel
Course in DC drives, PLC and HMI system.
Client: Kværner Eureka
1997

[ Energy ] [ Pulp & Paper/PMC ] [ Oil & Gas ] [ Other Process Industries ]


 Oil & Gas
RLWI mk II - Riserless Well Intervention system mark II RLWI Subsea Stack Control System
Engineering and development of a dynamically configurable control system for the RLWI mk II Subsea Stack. In addition to advanced stack operation and monitoring the system includes the following features: Separate SIL 2 verified Well Shutdown System, Generic Data Gateway for easier management and expansion.
Client: FMC Technologies
2006/07

TTRD - Through Tubing Rotary Drilling TTRD Subsea Stack Control System
Engineering and development of a dynamically configurable control system for the TTRD Subsea Stack. In addition to advanced stack operation and monitoring the system includes the following features: Riser Monitoring system, Well Information System, Valve Signature Analysis System and Remote System Management.
Client: FMC Technologies
2006/07

Alvheim FPSO Hard Ware Design
HW design for Safety and Automation System (SAS) Control Panels onboard Alvheim FPSO. Equipment: AIM 2000, Operator Stations and Ethernet communication etc.
Client: Kongsberg Maritime
2006

Chinguetti Modification of Communication Function
Changing communication logic on AIM2000 installation comunication with FMC smartmodem for subsea wells.
Client: Kongsberg Maritime
2006

Frame Agreement for Standard Control Valves Frame Agreement Development
Development of a frame agreement for purchase of standard control valves. The valves are mainly to be used at the Norwegian Continental Shelf. Responsible for the technical evaluation of the offers and consistency wiht the rest of Hydro's technical documentation.
Client: Norsk Hydro
2006

Nakika Subsea Wells
Implementing control for two new subsea wells in existing AIM 2000 installation.
Client: Kongsberg Maritime
2006

Norne Extension Control System
Configuration and testing of the control system AIM 2000 in connection with new subsea installations and a new communication system for the Norne field.
Client: Kongsberg Maritime
2006

Oseberg Delta New field implemented of WOCS
Created AIM 2000 configuration for field Oseberg Delta on workover control module.
Client: Kongsberg Maritime
2006

RLWI (Raiserless Light Well Intervention), TTRD Operation and Maintenance HMI System
Configuration and updating of the FMC Operation and Maintenance HMI system for subsea well systems for the following oil fields / projects: Statoil Satelite Project, Gullfaks, Snorre UPA, Vigdis, Aasgard, Heidrun.
Client: FMC Kongsberg Subsea AS
2006

Aasgard B Upgrade Control System Upgrade
Reconfiguration and testing of the control system AIM 2000 when upgrading the control system for Emergency and Process Shutdown (ESD/PSD) and Fire & Gas (F&G) systems at the Åsgard B Platform.
Client: Kongsberg Maritime
2006

Norne Control System
Configuration and testing of the control system AIM 2000 for new subsea installations at the Norne field.
Client: Kongsberg Maritime
2005

Norne Upgrade Control System Upgrade
Configuration and testing of the control system AIM 2000 when upgrading the control system for the subsea installations at the Norne field.
Client: Kongsberg Maritime
2005

Statfjord A/B/C Control System Upgrade
Creating, maintaining and running tool to upgrade from AIM1000 to AIM2000 for Statfjord A, B and C.
Specification and configuration of control system upgrade for various systems which was not previously covered by AIM 1000. In addition HW design for new Control Panels.
Client: Kongsberg Maritime
2004/06

FPSO White Rose Commissioning HVAC Plant
Commissioning of HVAC plant onboard the FPSO Sea Rose (former White Rose)
Client: AC Marine
2004

Fram Vest Control System Upgrade
Upgrade of control system AIM 1000 to AIM 2000.
Client: Kongsberg Maritime
2004

Kristin Control System
Configuration, Design, Test and Commissioning of the Control System AIM 2000 for several equipment packages (HVAC, Gas Cleaning , Diesel System, Flare Ignition System and Glucol) for the Kristin project. And in addition VDU design and configuration of Control System to Subsea installation.
Client: Kongsberg Maritime
2004

Ormen Lange Control System - Follow up
Follow up detail engineering, implementation and deliveries of Control Systems for the Ormen Lange project (Condensate Export and MEG Regeneration Plant on the onshore gas terminal at Aukra).
Client: Hydro Olje & Energi
2004

Rig 184 Redundant PLC
Delivery, programming and documentation of redundant PLC including OP-panel for HVAC system to living quarters at drilling rig Rig 184.
Client: ABB Miljø AS
2003

Rig 185 Redundant PLC
Delivery, programming and documentation of redundant PLC including OP-panel for HVAC system to living quarters at drilling rig Rig 185.
Client: ABB Miljø AS
2003

Ringhorne (Esso) Test and Commissioning
Test and commissioning of the Power Management System, Shutdown System and Fire & Gas System for the Ringhorn platform. Programming of the process control system PlantScape, including bus-communication.
Client: Honeywell
2003

Subsea Trenches Mobile Control Room
Design and construction of a mobile control room. This is used for Subsea digging of trenches and deployment of sea cables in connection to an offshore windmill installation in Denmark.
Client: Mika AS (Danmark)
2003

Withe Rose Redundant PLC
Delivery, programming and documentation of redundant PLC including OP-panel for HVAC system to living quarters at drilling rig Withe Rose.
Client: ABB Miljø AS
2003

Fram Vest Control Module Subsea installations
Industrialisation of a new generation control module for operation of subsea installations. Smart development to Fram West.
Client: FMC Kongsberg Subsea
2002

Gorilla VIII Redundant PLC
Delivery, programming and documentation of redundant PLC including OP-panel for HVAC system to living quarters at drilling rig Gorilla VIII.
Client: ABB Miljø AS
2002

Norne Control System
Delivery of Subsea Control System with HMI Topside. Configuration of Soft PLC and HMI. Installation of steering electronics in instrument bottle. FAT and commissioning offshore.
Client: Campus Marine / Kværner Oil & Gas
2002

Quality Assurance QA - responsible
QA - responsible for FMC Houston to follow up the deliveries of several control systems to topside and Subsea installations.
Client: FMC Houston
2002

Roncador FPSO Brazil Control System
Design, configuration, testing and commissioning of control system for subsea wells.
- HMI: InTouch
- PLC: GE Fanuc
Client: FMC Kongsberg Subsea
2002

Ringhorne (Esso) Control System
Responsible for design, configuration and programming of VDU (HMI). Responsible for programming, configuration, testing and commissioning of Fire & Gas and shutdown(ESD, PSD) nodes. Control System based on Plantscape and FSC.
Client: Honeywell
2001/03

Brasilian Petrobras Subsea Control Systems
Responsible for all activities regarding engineering, fabrication, delivery, installation and commissioning of Control Systems for operation of subsea production systems on great depths. Pierce II, Roncador, Marimba, Albacora, Viola.
Client: FMC Kongsberg Subsea
2001/02

GYDA platform BP Amoco Safety System
Project coordinator for safety systems on the GYDA platform. The old safety systems was to be replaced during production. Coding of ESD and F&G nodes on the Honeywell FSC controller.
Client: Honeywell
2001/02

Kvitebjørn (Statoil) Control System
Responsible for design, configuration and programming of VDU (HMI). Control System based on Plantscape and FSC.
Client: Honeywell
2001/02

Mikkel Control System
System engineering and follow-up of projects on Control Systems to Subsea Installations.
- Technical management
- System specifications
- Follow-up of detail engineering and production
- Production of test and commissioning procedures
- Follow-up of system tests
- User documentation for Production Control System
Client: FMC Kongsberg Subsea
2001

Sigyn Control System
System engineering and follow-up of projects on Control Systems to Subsea Installations.
- Technical management
- System specifications
- Follow-up of detail engineering and production
- Production of test and commissioning procedures
- Follow-up of system tests
- User documentation for Production Control System
Client: FMC Kongsberg Subsea
2001

Girassol, Angola Subsea - Engineering
Subsea acoustic monitoring system for downhole sensors.
Client: FMC Kongsberg Subsea
2000/01

Managerplan and control Overseeing Planning & Control
Overseeing the planning and control of all the company's international projects. Implementing new tools and methods to integrate the company's resources and activities independent of geographical location.
Client: Kongsberg Simrad Ocean Science
2000/01

Stena Don Fire & Gas, ESD
Configuration, object and application test of node E01 (Fire & Gas, ESD) onboard Stena Don (Drilling platform).
Client: Siemens Oil & Gas
2000/01

Heidrun Nordflanken Subsea - Engineering
Configuration and testing of control system for subsea unit for eight wells.
- Control system type AIM 1000
Client: Kongsberg Simrad
2000

R&B Drillrig Deepwater Nautilus Technical administration of Safety Systems
Responsible for the completion and delivery of a safety system as part of a total integrated automation system to a drilling rig built in South Korea. The project concerned design, implementation and testing as well as installation and commissioning on site.
Client: Kongsberg Simrad Safety Systems
2000

Rennesøy Baseutvikling (Rennbor) Control System
Design, engineering, programming and commissioning of control system, and configuration of Lenze motors for a transportable land-based drilling rig.
Client: EDM
2000

Snorre B Fire & Gas System
Configuration and testing of control system for fire and gas. Simatic S7 PLC.
Client: Siemens
2000

Stena Don Programming and Application Design
Application design of a Fire & Gas system. Development and use of tools for automatic configuration and quality control of Siemens CFC applications.
Client: Siemens Oil & Gas
2000

Mossgass Subsea - Engineering
Engineering, programming, configuration and testing of control system for subsea unit for 10 wells.
- Control system type AIM 1000
Client: Kongsberg Simrad
1999

Reading and Bates Safety Control System
System manager on safety including engineering and configuration of control system based on AIM 1000.
Client: Kongsberg Simrad
1999

Statfjord Nordflanken Gullfaks A, Aasgard A & B Subsea - System Engineering
System engineering and follow up of projects within the area control systems for subsea installations.
- Develop test and finishing procedures for production control systems.
- Develop system sketches for electric and hydraulic power distribution.
Client: Kongsberg Offshore
1999

Aasgard B Control System Upgrade
Upgrade of existing control system based on AIM.
Client: Kongsberg Simrad
1999

Aasgard A Work on Site
Participation in testing of control system on Aasgard A.
- Loop check
- Image design
- Configuration
Client: Kongsberg Simrad
1998

Lufeng Subsea - Electro and Instrumentation
Participation in project managment and manager of electro & instrumentation on Lufeng subsea. Responsible for project coordination of suppliers of umbilical, power distribution and instrumentation.
Client: Kongsberg Offshore
1997

Subsea Power Distribution Subsea
Development of distribution system for electric power subsea. Drives, frequency converters, electrical distribution and electrical supply for valves and electronic equipment situated on the seabed.
Client: Kongsberg Offshore
1997

Aasgard B Subsea Instrumentation
System engineering and follow up of deliveries to the subsea installation on Aasgard B.
Client: Kongsberg Offshore
1997

[ Energy ] [ Pulp & Paper/PMC ] [ Oil & Gas ] [ Other Process Industries ]


 Other Process Industries
Motordrives Dagblad Trykk Electrical system for a printing machine
Eveluation of the electrical system, including motordrives and regulation system for printing machine.
Client: Dagblad Trykk
2003

Rolling Mill Control systems and Drives
Upgrading of Controlsystem and drives for rolling hoop, Emulsion system and Hot roll.
Client: Hydro Aluminium
2003

Rolling Mill Controll system for cutting Al-blocks.
Control- and drive system for transporting and cutting aluminium-blocks after treatment in the Hot roll.
Client: Hydro Aluminium
2003

Rolling Mill Control Systems for Furnaces
Upgrading the control system for monitoring and control of 4 furnaces.
Including developing a redundant database system using MS SQL Server 2000 involving three servers used in production. A web based administrative report and trend system.
Client: Hydro Alumunium
2003

Saab Epsilon 440, Celle 2 Control System Upgrade
Upgrading of the Control system for production line.
Client: Stefertec Raufoss
2003

Production line Monitoring of production line
Monitoring of production line during cutting of aluminium profiles. To ensure that all profiles are cut to the right length, a line camera collects information into a mathematical model. Correct action can be taken based on the calculation.
Client: Hydro Automative Structure
2002

Production line New Production Line
Detail Engineering, programming, installation and commissioning of new production line.
Client: Raufoss Technology
2002

Rolling Mill Production Database
Production Database
Planning and development of a networked database system to store production data and recipes for an aluminium rolling mill.
Client: Hydro Aluminium
2002

Rolling Mill HotPass for web
Developing a web based batch- and report system. Involving one server and three client systems.
Client: Hydro Aluminium
2002

Saab Epsilon 440, Celle 2 Control- and regulation system
Detail engineering, programming, installation and commissioning of Process Line for Steertec Raufoss to part production in the Car Industry.
Client: Steertec Raufoss
2002

Nycomed Amersham, Lindesnes Control System
Configuration, testing and commissioning of control system.
Client: Kongsberg Simrad
2001/02

Tunnel Wireless Communiucation
Study of Wireless Commucation and Transmission of data and speach in tunnels at VEAS.
Client: VEAS
2001

Rolling Mill Project Management, Engineering and commissioning
Project follow up, interface engineering, supervision of a new installation of electrical equipment, PLC and motordrives to a rolling mill.
Client: Hydro Aluminium
2000/01

Rolling Mill Project follow up and engineering.
Project follow up, engineering assistance, assembly follow up of new electrical installation, PLC and drives for Norsk Hydro rolling mill in Holmestrand.
Client: Hydro Aluminium
2000

Paint Processing Engineering
Project follow up, guiding and programming of expansion of enamel installation for treatment of equipment for the car industry.
Client: Hydro Raufoss Automotive Plastics
1999/00

Ship CCS Cargo Control System
Programming, testing and commissioning of Cargo Control System for Shuttle Tanker
Project: M/T Jorunn Knutsen, Bygg Sestao 317
Project: M/T Hanne Knutsen, Bygg Sestao 318
Client: Hamworthy KSE
1999/00

Ship VOC Plant Programming and testing of process installation
Programming and testing of the process installation of the VOC plant aboard M/T Navion Viking
Project: Statoil, Ship M/T Navion Viking
Client: Hamworthy KSE
1999/00

Process Configuration
PLC based control system with HMI system based on display.
Client: DtC Lenze
1999

Ship Electrical Documentation
Preparation of electrical documentation for bridge systems for ships based on Elcad system.
Client: Kværner Marine Automation
1999

Titania Configuration
Programming, testing and commissioning of AIM 1000 upgrade.
Client: Kongsberg Simrad
1999

Tanker Norway Electrical Documentation
Preparation of electrical documentation for process equipment on tankers based on Elcad system.
Client: Kværner Ships Equipment
1998/99

Nycomed Imaging Lindesnes Norway Configuration.
Programming and testing of AIM 1000 upgrade.
Client: Kongsberg Simrad
1998

Printing Office Vestfold Norway Project Management
Engineering of project planning and accomplishment of all activities linked to Orkla Trykk' new printing office in Borgeskogen Stokke.
Client: Orkla Trykk as
1997/98

Ichikawa Japan Training of operators and technical personnel.
Course in use and maintenance of Finishing Machine.
Client: Kværner Eureka
1997